Feasibility study, and prepare detailed designs, drawings, cost estimates and bid documents for the construction of a bridge at Wismar, Linden
Lot 4 Works site 8: N 78 Village to Line Path, Corentyne
Lot 5 Works site 4: Grove/lookout, East Bank Essequibo
Banking and Financial Services
Belize – Sixth Consolidated Line of Credit (2019)
AIRPORT AIRFIELD AND GROUND SIDE PAVEMENT IMPROVEMENTS AND REHABILITATION
Design and Supervision of Infrastructure Works for the Crique Jute Village Rudimentary Water System Sub-project
Design and Supervision of Infrastructure Works for the San Jose Village – San Pablo Village Joint Rudimentary Water Systems Sub-projects
BEPII Expansion and Rehabilitation of Sir McChesney George Secondary School
RRL Expansion and Rehabilitation of Sir McChesney George Secondary School
FEASIBILITY STUDY AND PREPARING DETAILED DESIGNS FOR THE CONSTRUCTION OF A NEW STELLING AT PARIKA