Summary Scope of Contract:
Construction of a 130 m long by 20 m wide pier, 23 m wide RoRo ramp and a mooring dolphin.
- Construction of a filled causeway and roadway to access the pier and RoRo ramp and coastal protection
- Drainage and lighting for the pier, RoRo ramp and roadway.
- Dredging of the harbour basin and construction of seaward coastal protection.
- Fender upgrades at the port’s existing pier and landside slope stabilisation.
- Geotechnical investigations and design of all of the above works.